Skip to main content

Table 1 Adapted matrix scoring scheme

From: Assessment of constructed wetland projects as a multifunction landscape: a case study in Egypt

Category

Magnitude (M)

Significance (S)

Probability (P)

Duration (D)

Score

0

No Effect

No Significance

0–4% Probability

-----

1

Low Effect

Up to 20% Significance

5–24% Probability

Occasional

2

Tolerable Effect

21–40% Significance

25–49% Probability

Temporary

3

Medium–High Effect

41–60% Significance

50–74% Probability

Short Term

4

High Effect

61–80% Significance

75–99% Probability

Long Term

5

Very High Effect

81–100% Significance

100% Certain

Permanent