Table 3 Application of the proposed matrix on the 10th of Ramadan’s MCWPa

From: Assessment of constructed wetland projects as a multifunction landscape: a case study in Egypt

Impacts

Project Activities

Activities

Construction Phase

Operation Phase

Category

Impact Factors (IF)

Construction Phase Assessment

Percentage Achieved (%)

Operation Phase Assessment

Percentage Achieved

Environmental

Impact Factors

Climatic Aspects

Air Quality

 

2

 

40

 

5

 

100.00%

5

 

2

5

 

2

 

5

  

5

 

Urban Micro-Climate

 

2

 

12.8

 

5

 

100.00%

4

 

2

5

 

2

 

2

  

5

 

Carbon Foot-print

 

1

 

4.8

 

3

 

28.80%

3

 

2

4

 

2

 

2

  

3

 

Noise

 

0

 

0

 

3

 

4.80%

0

 

1

2

 

2

 

3

  

1

 

Sustainability

Energy

 

5

 

100

 

5

 

100.00%

5

 

2

5

 

2

 

5

  

5

 

Materials

 

5

 

100

 

5

 

100.00%

5

 

2

5

 

2

 

5

  

5

 

Solid/ Liquid Wastes

 

3

 

60

 

5

 

100.00%

5

 

2

5

 

2

 

5

  

5

 

Soil

 

2

 

6.4

 

3

 

48.00%

4

 

1

5

 

2

 

2

  

4

 

Biodiversity

Flora (Vegetation)

 

3

 

60

 

5

 

100.00%

5

 

2

5

 

2

 

5

  

5

 

Fauna

 

2

 

25.6

 

4

 

80.00%

4

 

2

5

 

2

 

4

  

5

 

Water

Water Reused

 

0

 

0

 

5

 

100.00%

5

 

1

5

 

2

 

3

  

5

 

Water Quality

 

0

 

0

 

4

 

80.00%

5

 

1

5

 

2

 

3

  

5

 
  1. aMCWP Multifunctional Constructed Wetlands Project