Table 5 Values of parameters used in calculations

From: Improving the operational performance of a wastewater treatment plant by using GPS-X simulations: a case study in northern Taiwan

Parameter

Value

Definition

\({\text{P}}_{\text{pusher}}\)

7.5

power of the flow pusher (kW)

\({\text{t}}_{\text{pusher}}\)

8,760

annual operation time of flow pusher (h)

\({\text{n}}_{\text{pusher}}\)

2

number of flow pusher

\({\text{C}}_{\text{electricity}}\)

2.5

average electricity cost of Guishan WWTP (NTD kWh−1)

\({\triangle{\text{P}}}_{\text{aerator}}\)

33

the increase of power of surface aerator (kW)

\({\text{t}}_{\text{aerator}}\)

8,760

annual operation time of surface aerator

\({\text{n}}_{\text{aerator}}\)

3

number of surface aerator

\({\text{CFC}}_{\text{electricity}}\)

0.509